Sutton Bridge REMIT

Sutton Bridge Forced Outage 26 SEP – Resolved


Category: Gas Turbine

GTA at the station unavailable due to low pressure on lift oil pump.

Reduction in available capacity for today was from 757MW to 370MW (until 14:30)

From: 26/Sep/2014 10:10

To: 26/Sep/2014 14:30