Sutton Bridge REMIT

Sutton Bridge GTB Trip (LCI Failure) – Full plant available from 17:30


Category: Gas Turbine

GTB encountered a 2nd LCI failure at 14:30.  the loss in availability was from 757MW to 370MW until 17:30.

GTB tripped on start up this morning, the loss in availability was from 757MW to 370MW between 05:30 and 14:00.

From: 29/Sep/2014 05:30

To: 29/Sep/2014 17:30