Sutton Bridge REMIT

Gas Turbine Instrumention Failure


Category: Gas Turbine

Publication according to Article 4 (1) of REMIT - Active Market Message - [BMU:SUTB-1]

Posted: 26th October 2015 @ 17:00

SUTB-1 availability decreased from 380Mw to 0 Mw from 09:15 26th October 2015 to 22:00 26th October 2015 due to repairs to GT Instruments.

Current expected return to 757 Mw availability @ 23:00 27.10.2015  (This post should be seen in conjunction with the 'Planned Annual Outage Extended' posting:  http://calonenergy.com/planned-annual-outage-extended/  made on the 26 Oct 2015 @ 09:15)

For further clarity:

Between: 09:15 26 Oct-15 to 22:00 26 Oct-15 - zero availability

Between: 22:00 26 Oct-15 to 23:00 27 Oct-15 - 380MW Available

Post: 23:00 27 Oct-15 - Full Availability (757MW)

This replaces the post entered on the 25th October 2015 @ 09:15

--------------------------------------------------------------------------------------------------------------------------

Posted: 26th October 2015 @ 09:15

SUTB-1 availability decreased from 380Mw to 0 Mw from 09:15 26th October 2015 to 23:00 27th October 2015 due to repairs to GT Instruments.

Current expected return to 757 Mw availability @ 23:00 27.10.2015  (This post should be seen in conjunction with the 'Planned Annual Outage Extended' posting:  http://calonenergy.com/planned-annual-outage-extended/  made on the 26 Oct 2015 @ 09:15)

This replaces the post entered on the 25th October 2015 @ 12:00

----------------------------------------------------------------------------

Posted: 25th October 2015 @ 12:00

SUTB-1 availability decreased from 380Mw to 0Mw from 12:00 25th October 2015 to 23:00 26th October 2015 due to gas turbine instrumentation failure.

Current expected return to 380 Mw availability @ 23:00 26.10.2015

 

 

From: 25/Oct/2015 12:00

To: 26/Oct/2015 22:00