Sutton Bridge: Sutton Bridge GTB Trip (LCI Failure) – Full plant available from 17:30


Category: Gas Turbine

GTB encountered a 2nd LCI failure at 14:30.  the loss in availability was from 757MW to 370MW until 17:30. GTB tripped on start up this morning, the loss in availability was from 757MW to 370MW between 05:30 and 14:00.

Click here to continue >>

Sutton Bridge: Sutton Bridge Forced Outage 26 SEP – Resolved


Category: Gas Turbine

GTA at the station unavailable due to low pressure on lift oil pump. Reduction in available capacity for today was from 757MW to 370MW (until 14:30)

Click here to continue >>

Severn Power: Unit 20 Compressor wash complete, unit available from 05:00


Category: Uncategorised

Reference number / Reference number 2014/09/25[CJH]-02 Type of asset or agreement Power Plant Affected unit(s) Severn 20 Country UK Time of capacity reduction 25.09.2014    –   01.00 hrs Company Macquarie Cause Outage Type of fuel(s) Gas Capacity influenced 410 MW Available … Continued

Click here to continue >>

Severn Power: Unit 20 Offline Compressor Wash


Category: Uncategorised

Reference number / Reference number 2014/09/25[CJH]-01 Type of asset or agreement Power Plant Affected unit(s) Severn 20 Country UK Time of capacity reduction 25.09.2014    –   01.00 hrs Company Macquarie Cause Outage Type of fuel(s) Gas Capacity influenced 410 MW Available … Continued

Click here to continue >>

Baglan Bay: Week 40 & Week 41 Baglan Bay Maintenance Outage


Category: Maintenance Outage

Baglan made available by Plant Operator 00:00 today. ——————————————————————————————————————————————————————————– Outage has been brought forward a day with the associated reduction in availability outlined below. ——————————————————————————————————————————————————————————– Further to confirmation with plant operator today, Baglan Bay is now expected to be on … Continued

Click here to continue >>

Baglan Bay: Gas Supply Curtailment Outage – TUE 16 SEP – RTS estimated 15:00


Category: Uncategorised

Notification has been received that the curtailment is coming to an end so the unit should be available from 15:00 ———————————————————————————————————————————————– Baglan Bay is expected to be unavailable on Tue 16th September 2014 for a minimum of 5 hours from … Continued

Click here to continue >>

Sutton Bridge: Gas Turbine gas leak – resolved 16:30 BST


Category: Gas Turbine

Sutton Bridge experienced a trip on start up Mon-01-Sep identified as being due to a gas leak in GTB. This issue has now been resolved.

Click here to continue >>